Some of the Key Highlights of the NASHIK Pipeline Water Supply & Distribution Management Projects are:
RCC elevated BPT (20 Lakh Litres).
Raw Transmission main (MS pipeline) from BPT at Gangapur dam to Bara bungalow (Approx 12.5 Km of Dia 1800 mm).
D.I. pipes (100 – 400 mm Dia, Total quantity: 500 RMT)